09-18-26
In this report, the cab completed initial assembly, the frame build continued, the pump house was completed initial assembly, the torque box arrived and was staged, and the body continued through paint.
09-04-26
In this report, the cab completed paint and was staged, the frame build continued, the pump house
was staged to continue initial assembly, and the body began the paint process.
08-28-26
In this report, the cab continued the paint process, the frame build began, the pump house was painted then staged to continue initial assembly, and the body
completed fabrication but was unavailable for photos.
08-21-26
In this report, the cab continued through paint, the pump
house continued initial assembly, and the body began fabrication.
08-14-26
In this report, the cab continued the paint process while the pump house began initial assembly.
07-31-26
This new Pierce apparatus is now
in production! In this report, the cab was fabricated and began the paint process with metal finishing.