02-13-26
In this report, the apparatus completed final assembly and test followed by release to quality and graphics where any remaining content will be applied.
02-06-26
In this report, the apparatus continued some assembly in an offline area of production.
01-16-26
In this report, the cab, pump house and body were merged with the frame at the start of initial apparatus assembly.
01-09-26
In this report, the cab continued initial assembly, the frame build continued, the pump house completed initial assembly and was staged, and the body completed the paint process.
12-19-25
In this report, the cab completed paint and began initial assembly, the frame build began, the pump house continued initial assembly, and the body completed fabrication and began the paint process.
12-12-25
In this report, the cab continued through paint, the pump house began initial assembly, and the body began fabrication.
12-05-25
In this report, the cab completed fabrication and began the paint process while the pump house structure was fabricated.
11-14-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.