01-30-26
In this report, the apparatus completed final assembly
and test followed by release to quality and graphics where any remaining content will be applied. Once finished it will be made ready for the customer
acceptance inspection. This is the last scheduled report.
01-09-26
In this report, the body was merged with the chassis at the start of initial apparatus assembly.
12-12-25
In this report, the cab and pump house were merged with the frame while the body completed paint and initial assembly.
12-05-25
In this report, the cab completed paint and began initial assembly, the frame build began, the pump house completed initial assembly, and the body completed fabrication and began the paint process.
11-14-25
In this report, the cab continued through paint, the pump house began initial assembly, and the body began fabrication.
11-07-25
In this report, the cab completed fabrication and began the paint process with metal finishing while the pump house structure was fabricated.
10-31-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.