09-04-26
In this report, the apparatus was staged to complete test. When testing completes it will release to quality and graphics where any
remaining content will be applied. When finished it will be made ready for the customer acceptance
inspection. This is the last scheduled report.
08-21-26
In this report, the apparatus completed initial assembly and began final assembly.
08-14-26
In this report, the body completed initial assembly and was merged with the chassis at the start of initial apparatus assembly.
08-07-26
In this report, the chassis was staged to continue assembly while the body began initial assembly.
08-07-26
In this report, the cab and pump house were merged with the frame while the body was staged to begin initial assembly.
07-24-26
In this report, the cab completed initial assembly, the frame build continued, the pump house was staged, and the body remained staged to begin initial assembly.
07-17-26
In this report, the cab began initial assembly, the frame build continued, the pump house completed initial assembly, and the body completed the paint
process.
06-26-26
In this report, the cab continued through paint, the frame
build began, the pump house began initial assembly, and
the body began fabrication.
06-05-26
In this report, the cab completed fabrication and began the paint process with metal finishing.
05-15-26
This new Pierce apparatus is now in production! In this report, the cab began fabrication.