09-18-26
In this report, the cab, frame, and body all remained staged while the pump house began the paint process.
09-04-26
In this report, the cab completed the paint process, while the frame, pump house, and body all remained staged.
08-28-26
In this report, the cab began the paint process, the frame arrived in Bradenton, the pump house remained staged, and the body completed the paint process.
08-21-26
In this report, the cab completed fabrication, the frame
was unavailable for photos, the pump house was staged,
and the body completed the fabrication process.
08-14-26
This new Pierce apparatus is now in production, In this report, the cab began fabrication, the frame build began, the pump began initial assembly, and the body panels began fabrication.