01-16-26
In this report, the aerial device completed pinning followed by the start of aerial testing.
01-09-26
In this report, the apparatus completed final assembly while the aerial device completed initial assembly and was being pinned.
12-19-25
In this report, the apparatus began final assembly while the aerial device began initial assembly.
12-12-25
In this report the torque box, turntable module, and body were merged with the chassis at the start of initial apparatus assembly while the aerial device arrived and was staged.
12-05-25
In this report, the chassis was being prepped to receive the torque box which began initial assembly, the turntable module completed paint, and the body completed initial assembly.
11-14-25
In this report, the chassis was staged to continue assembly, the torque box remained staged, the turntable module was unavailable for photos, and the body completed the paint process.
11-07-25
In this report, the cab and pump house were merged with the frame while assembly continued, the torque box remained staged, the turntable module began the paint process, and the body completed fabrication and began in paint.
10-31-25
In this report, the cab continued initial assembly, the frame build began, the pump house remained staged, the torque box was staged, the turntable module was fabricated, and the body began fabrication.
10-24-25
In this report, the cab completed paint and began initial assembly, the pump house completed initial assembly and the torque box arrived and was staged.
10-17-25
In this report, the cab began the paint process while the pump house began initial assembly.
10-03-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.