08-14-26
In this report, the apparatus continued testing. When testing completes it will release to final product evaluation where any remaining content will be applied.
Once finished it will be made ready for the customer acceptance inspection. This is the last scheduled report.
07-17-26
In this report, the apparatus completed final assembly followed by release to test.
06-26-26
In this report, the cab was merged with the frame, the pump house was staged, and the body completed initial assembly.
06-19-26
In this report, the cab began initial assembly, the frame was staged (no photos), the pump house completed initial assembly, and the body continued initial assembly.
06-12-26
In this report, the cab remain staged, the frame was
staged (no photos), the pump house continued initial
assembly, and the body began initial assembly.
06-05-26
In this report, the cab completed paint, the frame remained staged (no photos), the pump house continued initial assembly, and the body remained staged.
05-22-26
In this report, the cab began the paint process, the frame was staged (no photos), the pump house was painted, and the body remained staged.
05-01-26
In this report, the cab continued fabrication, the frame was unavailable, the pump house continued initial assembly, and the body completed the paint process.
04-24-26
In this report, the cab paused fabrication(no photos), the frame build began, the pump house began initial assembly, and the body completed fabrication and began the paint process with metal finishing.
04-17-26
In this report, the cab began fabrication while the body continued the fabrication process.
04-10-26
This new Pierce apparatus is now in production! In this report, the body panels began fabrication.