05-15-26

In this report, the apparatus completed final
assembly and began testing. Once testing completes
it will release to final product evaluation where any
remaining content will be applied. When finished it
will be made ready for the customer acceptance
inspection. This is the last scheduled report.


05-01-26

In this report, the apparatus continued final assembly.


04-24-26

In this report, the apparatus began final assembly.


04-17-26

In this report, the cab, pump house, and body were merged with the chassis at the start of initial apparatus assembly.


04-10-26

In this report, your cab continued initial assembly, the frame build continued, the pump house completed initial assembly, and the body began initial assembly.


04-03-26

In this report, the cab began initial assembly, the frame completed undercoating, the pump house completed initial assembly, and the body was staged (no photos).


03-27-26

In this report, the cab was staged, the frame was staged (no photos), the pump house completed paint and then continued initial assembly, and the body was staged(no photos).


03-20-26

In this report, the cab completed the paint process, the frame was staged (no photos), the pump house began the paint process, and the body remained staged.


03-13-26

In this report, the cab completed fabrication and began the paint process, the frame was staged (no photos), and the pump house and the body remained staged.


03-06-26

In this report, the cab returned to fabrication, the frame arrived in Bradenton, the pump house continued initial assembly, and the body completed the paint process.


02-27-26

In this report, the cab remained staged (no photos), the pump house began initial assembly, and the body completed fabrication and began the paint process.


02-20-26

In this report, the cab remained staged (no photos), the pump began assembly, and the body continued fabrication.


02-13-26

In this report, the cab was staged while the body began fabrication.


02-06-26

This new Pierce apparatus is now in production! In this report, the cab was fabricated.