41234 – Readington/Whitehouse – Saber Pumper

Saber Pumper
Job #: 41234

PROGRESS UPDATES


04-03-26

In this report, the apparatus was in queue to complete testing. Once finished it will release to final product evaluation where any remaining content will be applied. When complete, it will be made ready for the customer acceptance inspection. This is the last scheduled report.


03-27-26

In this report, the apparatus completed final assembly.


03-20-26

In this report, the apparatus began final assembly.


03-13-26

In this report, the cab, pump house, and body were merged with the frame.


03-06-26

In this report, the cab completed initial assembly, the frame build continued, the pump house began testing, and the body completed initial assembly.


02-27-26

In this report, the cab continued initial assembly, the frame build continued, the pump house continued initial assembly, and the body began initial assembly.


02-20-26

In this report, the cab began initial assembly, the frame build continued, the pump house continued initial assembly, and the body was staged.


02-13-26

In this report, the cab completed the paint process while the frame, pump house, and body were staged (no photos).


02-06-26

In this report, the cab began the paint process, the frame was staged (no photos), the pump house remained staged to continue initial assembly, and the body was staged to begin initial assembly (no photos).


01-30-26

In this report, the cab was staged, the frame was staged (no photos), the pump house was painted then staged to continue initial assembly, and the body completed the paint process.


01-23-26

In this report, the cab remained staged, the frame arrived in Bradenton, the pump house continued initial assembly, and the body completed fabrication and began the paint process.


01-16-26

In this report, the cab was staged (no photos), the frame build began (in WI), the pump house continued initial assembly, and the body continued fabrication.


01-09-26

In this report, the cab completed fabrication, the pump plumbing began assembly, and the body continued the fabrication process.


12-26-25

In this report, the cab began fabrication while the body continued fabrication (no photos).


12-19-25

This new Pierce apparatus is now in production. In this report, the body panels began fabrication.