05-23-25
In this report, the apparatus completed test and released to quality and graphics where any remaining content is applied.
05-09-25
In this report, the apparatus completed initial assembly and began final assembly.
05-02-25
In this report, the cab and pump house completed initial assembly and were merged with the frame followed by body installation at the start of initial apparatus assembly.
04-25-25
In this report, the cab began initial assembly, the pump house completed initial assembly, and the body completed paint and was staged.
04-18-25
In this report, the cab completed the paint process, the pump house was painted, and the body began in paint.
04-11-25
In this report, the cab began the paint process, the pump house began initial assembly, and the body completed fabrication.
04-04-25
In this report, the cab released to paint, the pump house structure was fabricated, and the body began fabrication.
03-14-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.