08-28-26
In this report, the cab was merged with the frame while the body began initial assembly.
08-21-26
In this report, the cab completed initial assembly, the frame build continued, and the body completed the paint process.
08-14-26
In this report, the cab continued initial assembly, the frame build began, and the body continued through paint.
08-07-26
In this report, the cab completed paint and began initial assembly, the frame rails were in queue to
begin the frame build, and the body was queued to begin the paint process.
07-31-26
In this report, the cab continued the paint process while the body completed fabrication.
06-26-26
In this report, the cab completed fabrication and began the paint process with metal finishing.
06-12-26
This new Pierce apparatus is now in production! In this report, the cab began fabrication.

