04-25-25
In this report, the apparatus completed final assembly and test followed by release to quality and graphics where any remaining content will be applied. Once finished, it will be made ready for the customer acceptance inspection. This is the last scheduled report.
04-11-25
In this report, the cab, pump house and body were merged with the frame followed by the start of final assembly.
04-04-25
In this report, the cab began initial assembly, the frame build began, the pump house completed initial assembly, and the body completed remained staged.
03-28-25
In this report, the cab completed paint, the pump house was painted, and the body completed paint and was staged.
03-21-25
In this report, the cab continued through paint, the pump house began initial assembly, and the body completed fabrication and began the paint process.
03-14-25
In this report, the cab began the paint process in metal finishing, the pump house structure remains staged, and the body began fabrication.
03-07-25
In this report, the cab remained staged while the pump house structure was fabricated.
02-14-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.