06-06-25
In this report, the apparatus continued the quality and graphics process where any remaining content is applied. Once finished, it will be made ready for the customer acceptance inspection. This is the last scheduled report.
05-23-25
In this report, the aerial device completed initial assembly and was pinned to the apparatus followed by the start of aerial testing.
05-16-25
In this report, the apparatus completed final assembly and was being prepped to receive the aerial device while the aerial device continued initial assembly.
05-09-25
In this report, the apparatus continued final assembly while the aerial device began initial assembly.
05-02-25
In this report, the turntable module completed initial assembly and was installed on the apparatus as final assembly continued, and the aerial device remained staged
04-25-25
In this report, the apparatus began final assembly while the turntable module began initial assembly, and the aerial device arrived and was staged.
04-18-25
In this report, the torque box and rear body completed initial assembly and were installed on the chassis while the turntable module remained unavailable for photos.
04-11-25
In this report, the pump house completed initial assembly and was merged with the chassis while assembly continued, the torque box began initial assembly, the turntable module remained unavailable for photos, and the rear body completed paint and began initial assembly.
04-04-25
In this report, the cab completed initial assembly and was merged with the frame, the pump house structure was fabricated and staged, the torque box arrived and was staged, the turntable module was unavailable for photos, and the rear body was fabricated and began the paint process.
03-28-25
In this report, the cab began initial assembly, the frame build continued, and the turntable module was fabricated.
02-21-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.