PROGRESS UPDATES


05-30-25

In this report, the apparatus began final assembly.


05-23-25

In this report, the cab completed initial assembly and was installed on the frame along with the body at the start of initial apparatus assembly.


05-16-25

In this report, the cab was staged to continue initial assembly, the frame build continued, and the body was staged to begin initial assembly.


05-09-25

In this report, the cab continued initial assembly, the frame build continued, and the body completed the paint process.


05-02-25

In this report, the cab began initial assembly, the frame build began, and the body completed fabrication and began the paint process in metal finishing.


04-25-25

In this report, the cab completed the paint process and was staged while the body began fabrication.


04-18-25

This new Pierce apparatus is now in production! In this report, the cab was fabricated and began the paint process.