39332 – Montvale – Arrow XT PUC Pumper

Arrow XT PUC Pumper
Job #: 39332

PROGRESS UPDATES


06-20-25

In this report, final assembly continued.


06-13-25

In this report, the body was installed on the chassis while the apparatus completed initial assembly and began final assembly.


06-06-25

In this report, the cab was merged with the frame while the body completed initial assembly.


05-30-25

In this report, the cab completed initial assembly, the frame build continued, and the body began initial assembly with PUC plumbing installation.


05-23-25

In this report, the cab completed paint and began initial assembly, the frame build continued, and the body continued through paint.


05-16-25

In this report, the cab continued through paint, the frame build began, and the body began the paint process with metal finishing.


05-09-25

In this report, the cab continued the paint process while the body was fabricated.


05-02-25

In this report, the cab was staged.


04-25-25

In this report, the cab began the paint process with metal finishing.


04-18-25

In this report, the cab was staged.


04-11-25

In this report, the cab completed fabrication.


04-04-25

This new Pierce apparatus is now in production! In this report, the cab began fabrication.

08-17-22

Sold by Salesman Bill Ring