Glassboro – 39834

Enforcer Pumper
Job #: 39834

PROGRESS UPDATES


11-07-25

In this report, the apparatus completed initial assembly and began final assembly.


10-31-25

In this report, the body was merged with the chassis at the start of initial apparatus assembly.


10-24-25

In this report, the cab and pump house completed initial assembly and were merged with the frame while the body completed paint and initial assembly.


10-17-25

In this report, the cab completed paint and began initial assembly, the frame build continued, the pump house began initial assembly, and the body began the paint process.


10-10-25

In this report, the cab began the paint process, the frame build began, the pump house structure remained staged, and the body completed fabrication.


10-03-25

In this report, the cab completed fabrication, the pump house structure was staged, and the body began fabrication.


09-26-25

This new Pierce apparatus is now in production! In this report, the cab began fabrication while the pump house structure was fabricated.