44092 – Montclair (Stock)

Pierce Enforcer Pumper
Job #: 44092

PROGRESS UPDATES


11-14-25

In this report, the apparatus completed final assembly and released to test. When testing completes it will release to final product evaluation where any remaining content will be applied. Once finished it will be made ready for the customer acceptance inspection. This is the last scheduled report.


11-07-25

In this report, the apparatus was staged to continue final assembly.


10-31-25

In this report, the apparatus began final assembly.


10-24-25

In this report, the cab was merged with the pump house, and the body were merged with the chassis at the start of initial apparatus assembly.


10-17-25

In this report, the cab was merged with the frame, the pump house completed testing, and the body completed initial assembly.


10-10-25

In this report, the cab completed initial assembly, the frame build continued, the pump continued testing, and the body was staged to continue initial assembly.


10-03-25

In this report, the cab began initial assembly, the frame was staged (no photos), the pump house completed initial assembly, and the body began initial assembly.


09-26-25

In this report, the cab, frame, and body remained staged (no photos) while the pump house continued initial assembly.


09-19-25

In this report, the cab was staged, the frame build began, and the pump house and body remained staged.


09-12-25

In this report, the cab, pump house, and body completed the paint process and were staged.


09-05-25

This new Pierce apparatus is now in production! In this report, the cab and body were fabricated and staged.