09-26-25
In this report, the apparatus completed testing then released to quality and graphics where any remaining content will be applied. Once finished it will be made ready for the customer acceptance inspection. This is the last scheduled report.
09-26-25
In this report, the apparatus completed testing and was released to quality and graphics where any remaining content will be applied. Once finished it will be made ready for the customer acceptance inspection. This is the last scheduled report.
09-19-25
In this report, the aerial device completed initial assembly and was pinned to the apparatus followed by the start of test.
09-12-25
In this report, the apparatus completed final assembly and was staged while the aerial device continued initial assembly.
09-05-25
In this report, the turntable module was installed on the apparatus at the start of final assembly while the aerial device began initial assembly.
08-22-25
In this report the chassis continued assembly, the torque box began initial assembly, the turntable module completed the paint process, and the body remained staged.
08-15-25
In this report, the pump house completed initial assembly and was merged with the chassis, the torque box arrived and was staged, the turntable module remained unavailable for photos, and the body was staged.
08-08-25
In this report, the chassis was staged to continue assembly, the pump house began initial assembly, the turntable module was unavailable for photos, and the body completed the paint process.
08-01-25
In this report, the cab completed initial assembly and was merged with the frame, the pump house structure was painted, the turntable module was fabricated, and the body completed fabrication and began the paint process.
07-25-25
In this report, the cab was staged to continue initial assembly, the frame build began, the pump house structure was fabricated, and the body began fabrication.
06-06-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.