02-13-26
In this report, the apparatus completed testing and was released to quality and graphics where any remaining content will be applied.
02-06-26
In this report, the aerial device was pinned to the apparatus followed by the start of aerial testing.
01-30-26
In this report, the aerial device completed initial assembly and was being pinned to the apparatus.
01-23-26
In this report, the apparatus continued final assembly while the aerial device continued initial assembly.
01-16-26
In this report, the transverse, turntable module, and the body were merged with the chassis, and your apparatus began final assembly while the aerial device began initial assembly.
01-09-26
In this report, the torque box completed initial assembly and was merged with the chassis, the transverse and the turntable module completed the paint process, the body completed initial assembly, and the aerial device remained staged.
12-19-25
In this report, the cab was merged with the frame, the transverse continued through paint, the torque box remained staged, the body remained staged, and the aerial device arrived.
12-12-25
In this report, the cab continued initial assembly, the frame build began, the transverse completed fabrication and began the paint process, the torque box arrived and was staged, and the body remained staged.
12-05-25
In this report, the cab completed the paint process and began initial assembly while the body completed fabrication and paint.
11-14-25
In this report, the cab completed fabrication and began the paint process while the body began fabrication.
10-24-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.