41069 – Vernon – Saber Dry Side Tanker

Saber Dry Side Tanker
Job #: 41069

PROGRESS UPDATES


10-17-25

In this report, testing completed and the apparatus released to final product evaluation where any remaining content will be applied. Once finished it will be made ready for the customer acceptance inspection. This is the last scheduled report.


10-10-25

In this report, final assembly was completed, and the apparatus began testing.


10-03-25

In this report, the apparatus began final assembly.


09-26-25

In this report, the apparatus continued initial assembly.


09-19-25

In this report, the body was merged with the chassis.


09-12-25

In this report, the chassis remained staged to continue assembly while the body was staged (no photos).


09-05-25

In this report, the chassis was staged to continue assembly while the body completed initial assembly.


08-22-25

In this report, the cab was merged with the frame while chassis assembly continued, the pump house was queued to be mounted, and the body began initial assembly.


08-15-25

In this report, the cab completed initial assembly, the frame build continued, the pump house completed initial assembly, and the body remained staged.


08-08-25

In this report, the cab began initial assembly, the frame was staged (no photos), the pump house continued initial assembly, and the body remained staged.


08-01-25

In this report, the cab was staged to begin initial assembly, the frame remained staged (no photos), the pump house continued initial assembly, and the body remained staged (no photos).


07-25-25

In this report, the cab was staged, the frame remained staged (no photos), the pump house was painted, and the body was staged (no photos).


07-18-25

In this report, the cab completed the paint process, the frame remained staged (no photos), the pump house continued initial assembly, and the body completed the paint process.


07-11-25

In this report, the cab completed fabrication and began the paint process in metal finishing, the frame was staged (no photos), the pump house began initial assembly, and the body completed fabrication and began the paint process.


06-27-25

This Pierce apparatus is now in production. In this report, the cab began fabrication, the frame build began, and the body began fabrication.