40865 – Clinton – Enforcer Pumper

Enforcer Pumper
Job #: 40865

PROGRESS UPDATES


09-12-25

In this report, the cab and pump house were merged with the chassis while the body completed initial assembly.


09-05-25

In this report, the cab completed the paint process, the frame build continued, the pump house completed initial assembly, and the body completed the paint process.


08-22-25

In this report, the cab and body were unavailable for photos while the pump house began initial assembly.


08-15-25

In this report, the cab remained staged while the body was fabricated.


08-08-25

In this report, the cab remained staged.


08-01-25

In this report, the cab was staged to begin the paint process.


07-25-25

In this report, the cab completed fabrication.


07-18-25

This new Pierce apparatus is now in production! In this report, the cab began fabrication.