08-08-25
In this report, the apparatus continued the quality process where any remaining content is applied. Once finished, it will be made ready for the customer acceptance inspection. This is the last scheduled report.
08-01-25
In this report, the apparatus completed final assembly and test then released to quality and graphics where any remaining content will be applied.
07-25-25
In this report, the apparatus completed initial assembly and began final assembly.
07-18-25
In this report, the body completed initial assembly and was installed on the chassis.
07-11-25
In this report, the cab and pump house completed initial assembly then were merged with the frame while the body began initial assembly.
06-20-25
In this report, the cab continued the paint process while the pump house began initial assembly.
06-13-25
In this report, the cab continued through paint while the pump house continued fabrication.
06-06-25
In this report, the cab completed fabrication and began the paint process with metal finishing while the pump house structure was fabricated.
05-30-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.