06-13-25
In this report, the body completed initial assembly and was installed on the chassis.
06-06-25
In this report, the cab and pump house completed initial assembly and were merged with the frame while the body completed paint and began initial assembly.
05-30-25
In this report, the cab completed the paint process, the pump house continued initial assembly, and the body began the paint process.
05-23-25
In this report, the cab continued the paint process, the pump house continued initial assembly, and the body completed fabrication but was unavailable for photos.
05-16-25
In this report, the cab continued through paint, the pump house began initial assembly, and the body began fabrication.
04-11-25
This new Pierce apparatus is now in production! In this report, the cab began fabrication.

