39470 – Sayreville – Velocity Ascent Platform Ladder

Veolcity Ascendant Platform Ladder
Job #: 39470

PROGRESS UPDATES


08-22-25

In this report, the apparatus was staged to continue testing.


08-15-25

In this report, the aerial device completed initial assembly and was pinned to the apparatus followed by the start of aerial testing.


08-08-25

In this report, the turntable module was installed and the apparatus completed final assembly while the aerial device continued initial assembly.


08-01-25

In this report, the apparatus began final assembly, the turntable module was unavailable for photos, and the aerial device arrived and began initial assembly.


07-25-25

In this report, the turntable module was staged to continue the paint process while your apparatus completed initial assembly and was staged.


07-18-25

In this report, the turntable module continued through paint while the body completed initial assembly and was merged with the chassis.


07-11-25

In this report, the pump house and torque box were installed on the chassis, the turntable module began the paint process, and the body began initial assembly.


06-20-25

In this report, the cab completed initial assembly, the frame build began, the pump house structure was fabricated, the turntable module was staged, and the body was fabricated and began the paint process.


06-13-25

In this report, the cab completed the paint process and began initial assembly.


06-06-25

In this report, the cab continued through paint.


05-30-25

In this report, the cab began the paint process.


05-23-25

In this report, the cab completed fabrication.


05-16-25

This new Pierce apparatus is now in production! In this report, the cab began fabrication