08-25-23
In this report, the cab remained staged to continue through paint, the pump house continued initial assembly, and the rear body module was staged to begin the paint process.
08-18-23
In this report, the cab was staged to continue the paint process, the pump house structure was painted, and the rear body module completed fabrication.
08-11-23
In this report, the cab continued through paint, the pump house structure was staged for paint, and the rear body module began fabrication
08-04-23
In this report, the cab began the paint process while the pump house structure began fabrication.
07-28-23
This new Pierce apparatus is now in production. This week, the cab was fabricated and staged.